Track Record of Delivery

Landmark Engineering Projects on the UK Railway Network

Discover how our chartered civil, structural, geotechnical, and M&E engineers solve high-stakes challenges under operational rail constraints and compressed possession programmes.

Proven Case Studies

Detailed Infrastructure Case Studies

Explore 16 in-depth engineering studies featuring quantifiable metrics, technical innovations, and client outcomes.

Structures & Geotech Story Contracting

1. DCL-56 Old River Cherwell Underbridge Renewal

Location / Line King's Sutton (Didcot to Chester)
Structure Type 9.6m NRSD Type-E Steel
Deck Weight 240 Tonnes Lift
Possession Window 5-Day Blockade (July 2024)

Complete multidisciplinary engineering for replacing the critical DCL/56 bridge over the flood-prone River Cherwell. Deliverables included Structures Form A and Form B, AFC drawings, Permanent Way GRIP 4/5 track alignment integration, and geotechnical GIR/GDR reports.

Engineering Challenge & Solution: Piles met unexpected refusal early during installation; FJD re-engineered the foundation capacity in real time, liaising with CAT 3 checkers without delaying the blockade. Supported Environment Agency flood modelling and resolved all site TQs within 72 hours. The 240-tonne deck was smoothly installed using two rail-mounted Kirow cranes.

Multidisciplinary Taziker / Stantec

2. Bristol Temple Meads Station Refurbishment Design

Location Bristol, South West
Heritage Status Grade I Listed Interchange
Duration 3.5 Years Programme
Modelling Finite Element (FEA) Arches

Engineering support for the major multi-million-pound refurbishment of Brunel's iconic transport hub. Involved from early development conducting visual defect inspections, intrusive undercroft surveys, and structural integrity assessments.

Engineering Challenge & Solution: Proved operational platform load capacity for heavy temporary works using finite element analysis on the supporting historical brick arches. Sited customer information, telecoms, and temporary lighting within federated 3D BIM models to eliminate shadow corridors. Designed a sympathetic catalogue of reusable structural repairs for ornate cast-iron and severe steel section loss discovered during blast cleaning.

Civils & Signalling Lundy Projects

3. Birmingham New Street Area Resignalling

Location Birmingham New Street
Duration 2 Years Programme
Standardisation 75% Platform Blueprint
Discipline Civil & Signal Structures

Detailed design of canopy-mounted signal structures for curved, bidirectional platforms at the UK's busiest interchange outside London.

Engineering Challenge & Solution: Extreme platform curvature and opposing train movements created severe signal sighting risks. FJD developed overlapping multi-scenario CAD sighting models, creating a standardised structural bracket design that served as the blueprint for 75% of canopy structures, accelerating fabrication and installation.

Low-Carbon Civils Birmingham & Derby Line

5. Whitacre Heath Footbridge Renewal

Design Life 120 Years Minimal Maint.
Asset Innovation Precast Concrete Deck
Possessions Weekend Windows
Clearances Electrification Passive

Replacement of a life-expired wrought-iron lattice footbridge across two operational railway tracks connecting Whitacre Heath to green-space footpaths.

Engineering Challenge & Solution: Rather than replacing like-for-like with high-maintenance painted steel, FJD designed an innovative precast concrete half-through deck with integrated precast stairs—believed to be a first on Network Rail. Evaluated ground bearing capacity to take the heavier deck, achieving a 120-year design life, minimal lifecycle carbon, and passive provision for future 25kV electrification.

M&E & Geotech Keltbray Rail

6. Colchester Depot Redevelopment

Client / Fleet Greater Anglia New Trains
Hazardous Area DSEAR / ATEX Zone 1
Fuel Storage 2 × 40kL Fuel Tanks
Auger Bore 5-Track 2.5m Depth UTX

Multidisciplinary design upgrading Colchester Depot for Greater Anglia's high-efficiency train fleet.

Engineering Challenge & Solution: Civils engineered foundations for fuel and AdBlue tanks with emergency spill interceptors. Geotech designed a 5-track guided auger-bored UTX with ground improvement. M&E delivered electrical, CET, and compliant lighting across DSEAR Zone 1 hazardous areas, coupled with UK Power Networks DNO applications for a new 400A cubicle.

Multidisciplinary Amey Consulting / TfW

7. Core Valley Lines Infrastructure Redevelopment

Location South Wales Valleys
Client KeolisAmey / TfW
Modelling 2D/3D BIM Fly-Throughs
Verification HDD/DD UTX CAT 3 Checks

Multidisciplinary design across South Wales to upgrade line capacity, rolling stock, and passenger facilities for Transport for Wales.

Engineering Challenge & Solution: Designed station redevelopments including foundations, platform overlays for level boarding, new footbridges with DDA ramps, and traction substation foundations. Carried out CAT 3 checks on horizontal directional drilled (HDD) undertrack crossings and delivered federated 3D BIM models for stakeholder review.

Asset Management Amco Giffen Rail

8. Hidden Critical Element Inspection & Repair

Stations Audited 61 Stations Across Wales
Timescale Phased 13 Weeks
Emergency Actions Chester & Cardiff Queen St
Heritage Grade II & II* Listed

Exposing and rigorously assessing hidden critical loadbearing elements of footbridges and canopies across 61 stations.

Engineering Challenge & Solution: At Cardiff Queen Street, identified severe column distress prompting immediate Emergency Repair Responses. At Grade II* listed Chester Station, discovered complete web section loss on platform I-section columns; devised rapid emergency propping schemes and conducted a global canopy stability analysis to keep the operational railway running safely.

Civil Engineering Balfour Beatty

9. Pentrebach Station Level Boarding (Platform Overlay)

Location Merthyr Tydfil, Wales
Programme Rapid 1-Month Delivery
Material Lightweight GRP Overlay
Impact TfW Level Boarding

Detailed design of a modular platform overlay system modifying platform copers without intrusive structural modifications to the operational platform wall. Evaluated cross-falls, stepping distances, and bespoke fabrication details to enable DDA step-free level boarding for TfW's new rolling stock fleet.

M&E Engineering John Sisk & Sons

10. Polsloe Bridge Station Lighting Design

Location Exeter, South West
Cost Reduction 87% Scheme Savings
Lighting Innovation Low-Level Handrail LED
Emergency Backup 3-Hour Static Inverter

Replacing temporary 110V lighting on platforms structurally unable to support standard lighting columns. Devised an intelligent, low-level handrail-mounted LED system eliminating driver glare while achieving 87% financial savings and full Network Rail emergency compliance.

Multidisciplinary Amey Consulting

11. Quakers Yard Station Redevelopment

Location Merthyr Tydfil line
Role Lead Civil Engineering Designer
Transformation Single to Twin Platform
Access Step-Free Footbridge & Ramps

Lead civil design for converting a single-platform halt into an accessible two-platform station. Designed foundations, platform extensions, the new Up platform, step-free ramps, and footbridge integration via federated 3D BIM models.

Civil Engineering Siemens Mobility

12. Bespoke UTX Civil Engineering Design

Location Lewisham, London
Client Siemens Mobility
Innovation Precast Culvert Reuse
Track Crossings 2 Lines on Embankment

Under-track crossing beneath two lines on a steep embankment tying into a reception pit. Reused an existing precast culvert design at a calculated slope that met Network Rail depth standards while remaining shallow enough for proprietary temporary shoring, eliminating constructability risks.

Structural Engineering Story Contracting

13. River Derwent Underbridge Strengthening

Location Derbyshire (Bridge SPC7/8)
Challenge Severe Bearing Defects
Strategy Strengthen Without Lifting
Environmental Zero River / Towpath Closures

Structural repair of bridge SPC7/8 whose route availability was impaired by bearing defects. Devised complex steelwork repairs without bridge jacking, reviewed foundation scour to avoid substantial underwater remediation, and staged all works during weekend/night possessions.

M&E & Civils Alma Rail

14. Tyne Yard Depot Walkway & Lighting Design

Location Gateshead, Tyne & Wear
Walkway Length > 1.5 km New Walkway
Standard BS EN 12464-2 Compliant
Turnaround Delivered in 4 Weeks

Electrical and civil design for modified maintenance walkways supporting new rolling stock. Designed 1.5 km of concrete/GRP maintenance walkways, track crossings, and low-level bollard lighting delivered from initial site survey to approved drawings in four weeks.

Temporary Works Bridge LEC2/79

15. River Anker Temporary Cable Support

Location Tamworth to Polesworth
Material Non-Conductive GRP Tubing
Safety Induced Current Designed Out
Reusability Re-deployed on River Trent

Temporary cable diversion works for bridge re-waterproofing. Designed a lightweight, non-conductive GRP tubing support that designed out induced current risks from overhead OLE lines while maintaining passing train clearance envelopes. The low-carbon modular design was subsequently re-used on River Trent viaduct works.

Electrical & Civils Actemium / Porsche

16. EV Charging Systems Infrastructure Design

Location Porsche Centre South Lakes
Charger Units 2 × 120 kW DC Rapid
Standard BS 7671 Electrical
Substation Substation Feeder Pillar

Complete engineering design for 2 × 120 kW DC superchargers. M&E performed electrical load analyses, cable calculations, and selectivity studies under BS 7671, while Civils designed structural plinths and foundations for the chargers and feeder pillars.